Avanti and London Northwestern run amended Euston timetables from 27 December to 3 January, and Northampton to Rugby is shut 27 December to 1 January.
Network Rail has published its Christmas plan for the West Coast Main Line. Avanti West Coast and London Northwestern Railway run an amended timetable to and from London Euston from Sunday 27 December to Sunday 3 January, and from Sunday 27 December to Friday 1 January no trains run between Northampton and Rugby, with buses via Long Buckby. London Northwestern trains keep running between Euston, Milton Keynes Central and Northampton. This page sets out what is booked, what happened the last two Christmases, and what changes on the roads and in the car parks.
Overview
- Amended Euston timetables from Sunday 27 December to Sunday 3 January on Avanti and London Northwestern, and Avanti timetable changes from 24 December.
- Northampton to Rugby is shut from Sunday 27 December to Friday 1 January, with buses via Long Buckby. Euston to Milton Keynes and Northampton trains run; Birmingham trains run only to Northampton, then restart from Rugby.
- Late on Tuesday 22 and Wednesday 23 December, work between Wolverton and Rugby diverts six late-night Avanti trains via Northampton, without stopping there.
- Last Christmas, buses replaced all trains between Milton Keynes and Northampton or Rugby for almost two weeks while Network Rail rebuilt Hanslope Junction.
- Parking in central Milton Keynes is free on Christmas Day only. Charges apply every other day, Boxing Day and New Year’s Day included.
Last checked 18 November 2026.
Christmas week: what is listed so far
Network Rail’s release of 12 November asks anyone travelling to or from Euston between 24 December and 1 January to check before they go. The main job is a £9.3m replacement of the 65-year-old bridge deck that carries the railway over the River Nene near Northampton. Engineers are also upgrading the power supply between North Wembley and Bourne End, the stretch between Euston and Milton Keynes, and improving drainage in Crick Tunnel. Avanti says its timetable to and from Euston changes between 24 December and Friday 1 January, and that online journey planners already carry the Christmas timetables, with all ticket types on sale.
Birmingham New Street is shut from Thursday 24 to Monday 28 December while overhead power lines are replaced, so no trains serve the station in those days.
London Northwestern’s notice for Sunday 27 December to Friday 1 January says engineering work between Northampton and Rugby closes all lines via Long Buckby for the whole week. What that means in practice:
- Trains between Euston or Northampton and Birmingham New Street run only between Euston and Northampton, and separately between Rugby and Birmingham International (Sunday and Monday) or Rugby and Birmingham New Street (Tuesday to Thursday).
- Buses run between Northampton and Rugby via Long Buckby all week.
- On Friday 1 January the 21.13 Crewe to Northampton train diverts and ends at Milton Keynes Central, with a bus from Rugby to Northampton.
So a Milton Keynes passenger heading to Coventry or Birmingham that week either takes an Avanti train or changes to a bus at Northampton. Check the exact train in a journey planner, as Avanti’s Euston timetable is amended all week.
Before that, Avanti’s late-night trains are diverted on Tuesday 22 and Wednesday 23 December because of work between Wolverton and Rugby. The 21.04 Crewe to Euston, 22.03 Euston to Manchester, 22.15 Manchester to Euston and the 22.30, 23.00 and 23.30 Euston to Wolverhampton trains all run via Northampton without calling there, so they take longer.
Nothing is listed yet for Christmas Eve, Boxing Day or the Saturday 26 December.
What is already booked before Christmas
These are the works still to come on National Rail’s planned engineering list that touch Milton Keynes Central before Christmas week. Each one links to the notice.
| Date | What changes | Operators |
|---|---|---|
| Sunday 22 November | Before 7.45am, buses replace trains between London Euston and Milton Keynes Central or Northampton. | London Northwestern |
| Monday 23 November | After 10.30pm, trains from Euston terminate at Milton Keynes Central, and buses run on to Northampton. | London Northwestern |
| Saturday 28 and Sunday 29 November | Paddington is shut, so Great Western trains use Euston. Avanti runs two trains an hour to Birmingham, and most London Northwestern trains between Euston and Milton Keynes are retimed by a few minutes. | Avanti West Coast, London Northwestern |
| Tuesday 1 to Thursday 3 December | Overnight work between Wolverton and Rugby. Five late-night Avanti trains divert via Northampton. | Avanti West Coast |
| Monday 14 to Friday 18 December | Late-evening Avanti changes. Monday to Thursday, the 18:52 Edinburgh to Euston diverts between Rugby and Milton Keynes Central and does not call at Northampton. | Avanti West Coast |
For Sunday travel in general, check the week before. These notices appear on a rolling basis and more are added every week. For road closures over the same period, see our Milton Keynes roadworks page, and for normal journey times and fares, our trains to London page.
What happened the last two Christmases
Christmas 2025. Network Rail announced on 7 October 2025 that “between 24 December and 5 January, there will be no trains between Milton Keynes and Northampton / Rugby”. The reason was a £26m upgrade of Hanslope Junction, on all four main lines just north of the city. Where there was no other rail route, replacement buses ran. Network Rail said hundreds of other projects would run along the route between 24 December and 15 January.
Christmas 2024. Network Rail’s release of 7 November 2024 listed “track drainage improvements near Milton Keynes”, with buses replacing all trains between Milton Keynes, Northampton and Rugby on New Year’s Day, and an amended service between Watford and Milton Keynes from 1 to 4 January. Its advice to anyone using Euston was to travel before 24 December or after 2 January.
Network Rail’s 2024 release described the railway’s traditional closure as running from the end of service on Christmas Eve to the morning of 27 December. In both years the big jobs near Milton Keynes then ran on into the week after, so the days between Christmas and New Year are the ones most likely to need a bus.
Christmas 2026: what the calendar means
Christmas Day 2026 is a Friday, so the Boxing Day bank holiday moves to Monday 28 December, and New Year’s Day is also a Friday, according to the government’s bank holiday list. Boxing Day itself is a Saturday. Operators have not yet published their Christmas Eve last trains or their timetables for 27 December onwards.
Parking over Christmas
Milton Keynes City Council says parking charges in central Milton Keynes apply from 7am to 6pm every day, “except for Christmas Day and Easter Sunday”. So Boxing Day, the Monday bank holiday and New Year’s Day are all charged at the usual rates. The council has not announced any extra Christmas shopping concession. Our parking page has the full tariffs and colour-coded bays.
Buses
Arriva, which runs most Milton Keynes routes, lists its bank holiday timetables for Beds and Bucks on its bank holidays page. As of 25 September the page stops at 31 August and has nothing for Christmas yet. We will add the Christmas timetable when Arriva publishes it.
Still to be confirmed
- Network Rail’s Christmas and New Year announcement for the West Coast Main Line. Still unpublished on 11 October; last year’s came out on 7 October. The National Rail notices above are the operators’ versions, and more days may be added.
- Christmas Eve last trains from London Northwestern, Avanti West Coast and Lumo, and the Bletchley to Bedford line. Usually published in December.
- Arriva’s Christmas and New Year bus times.
School holidays run from 21 December to 1 January; see our term dates page. For bin changes over the same weeks, see Christmas bin collections.
Have your say